Residential energy code · IECC compliance

Permit-ready REScheck report. $79, delivered in 24 hours.

We prepare your REScheck-Web compliance certificate from your plans and deliver a permit-ready PDF — built to your jurisdiction’s adopted IECC energy code. Accepted in all states where applicable.

$79 flat 24-hour turnaround 3 free re-runs until accepted All states where applicable
Newly built single-family home PASSES
$79
Flat price / report
24h
Turnaround
3
Free re-runs until accepted
$109
With mechanical + lighting

See a sample before you order

SECTION 01

Open a full sample REScheck-Web compliance certificate — the same format your permit office receives. Reviewing the deliverable up front is the simplest way to know exactly what you’re getting.

  • 13-page REScheck-Web report, permit-ready.
  • Envelope assemblies, UA trade-offs, inspection checklist.
  • Compliance statement page, signed by us as preparer.
See the sample

A real REScheck report, anonymized — every client and project detail removed.

How it works

SECTION 02
01

Your project details

Name, email, jobsite address and conditioned square footage. About two minutes.

02

Plans & options

Upload your drawings (PDF), add the mechanical + lighting sections (+$30) or a PE seal (+$149, not normally required) only if your permit office asks for them, then click Continue to secure checkout.

03

Card payment — last step

Enter your card number, expiry and CVC on Stripe’s secure checkout. A card is required to place the order; it’s held for the price, not charged.

After checkout: we prepare your REScheck-Web certificate to your jurisdiction’s adopted IECC, your draft arrives by email within 24 hours, and only then is your card charged — with up to 3 free re-runs until your permit office accepts it.

Why builders choose Get REScheck

SECTION 03

One flat price, no quote step

$79 per report, every time. The price you see is the price you pay — no estimate, no surprises.

Delivered in 24 hours

Submit your plans today, get a permit-ready PDF by email tomorrow. Turnaround that keeps your permit on schedule.

Matched to your jurisdiction

Built to the exact IECC version your permit office has adopted, including state amendments. Accepted in all states where applicable.

3 free re-runs until accepted

If your permit office requests changes, we re-run the report at no charge — up to 3 times — until it’s accepted.

One flat price

SECTION 04
$79 / report
24-hour turnaround · all states where applicable

One residential REScheck envelope report, prepared from your plans. Need the mechanical and lighting sections too? Add them for $30 ($109 total). No hidden fees and no quote step — the price you see is the price you pay.

Florida: the prescriptive Florida REScheck is the normal $79. Form R405 performance reports are quoted on request. California residential Title 24 is not offered. State coverage →

Need a Manual J too? Order REScheck with Manual J/S/D at getmanualjsd.com and save $50.

Order your report

What’s included

  • Full REScheck-Web compliance certificate (PDF).
  • Envelope UA trade-off analysis.
  • Inspection checklist pages.
  • Up to 3 free revisions until your permit office accepts it.
  • Optional: mechanical + lighting sections, +$30 ($109 total).
  • Same plan on another lot or orientation: $39 re-issue. How →
  • Signed by us as preparer. Optional PE seal, +$149 — not required in most states: the energy code lets the preparer sign a REScheck. Why →

What clients say

CLIENT FEEDBACK
I hired Sabrul to assist with a project that lasted a couple of years. He is a very kind man and a true professional. His work ethic is beyond what anyone in our team expected. I highly recommend him for the job.
Steve T.
Multi-year MEP engagement · Verified
★★★★★ 5.0
I enjoy working with Sabrul immensely and I have continued working with him on many projects after this. He is a trusted resource and supported all our projects with everything…
Verified client
Residential fire-sprinkler drawings
★★★★★ 5.0
Sabrul is a great problem solver. Very easy to work with. Takes the time to understand [our] project’s needs and issues. Did his research to find alternative solutions to problems…
Verified client
Fire-detection system design

Reviews of the founder’s engineering work, quoted from his client-verified freelance profile.

Where our team has delivered

COVERAGE

Your REScheck work is prepared by a building-engineering team with 400+ delivered projects across 31 US states, Washington DC and the U.S. Virgin Islands. Hover or tap a state to see our track record there.

400+Projects deliveredHomes to hospitals, on our project record
31US statesPlus Washington DC and the U.S. Virgin Islands
230+Cities & townsAcross the US and abroad
8Countries & territoriesAcross four continents
31 states · hover or tap a state

Shading shows delivered projects per state. Also delivered in Washington DC and the U.S. Virgin Islands (St. Croix).

Where we have delivered

  • United States31 states, Washington DC and the U.S. Virgin Islands · 379 projects
  • United KingdomHarwell, Oxfordshire
  • GermanyDresden · Ralswiek
  • AustraliaMornington, Victoria
  • KuwaitShuwaikh, Kuwait City
  • BangladeshDhaka · Chattogram · Gazipur · Narayanganj
  • Cayman IslandsResidential
  • American SamoaPago Pago

What we have delivered, where

Every delivered US project on our record, by state and building type. Each outlined square is one project; a solid square with a number marks seven or more.

StateHomes & ADUsMulti-family & mixed-useOffice & commercialRetail, food & hotelsHealth, education & labsCivic & institutionalIndustrial & otherProjects
California4815453198156
Texas231213128779
Florida139942
New York1315
Georgia12
Colorado9
Maryland7
Pennsylvania7
Washington6
Michigan5
New Jersey5
Ohio5
Massachusetts4
Arizona3
Connecticut3
Missouri3
New Mexico2
North Carolina2
South Carolina2
Virginia2
Alabama1
Arkansas1
Illinois1
Indiana1
Nevada1
Tennessee1
U.S. Virgin Islands1
Utah1
Washington DC1
Wyoming1
one project seven or more
All 237 cities and towns we have delivered in

California (88) Aliso Viejo · Altadena · Anaheim · Antioch · Arcata · Atherton · Bakersfield · Berkeley · Big Sur · Burney · Canoga Park · Carlsbad · Chatsworth · Citrus Heights · Concord · Covina · Crestline · Daly City · El Dorado Hills · Elverta · Emerald Hills · Fairfield · French Camp · Geyserville · Glendale · Granada Hills · Hanford · Hermosa Beach · Hollister · Hollywood · Irvine · Joshua Tree · Jurupa Valley · La Habra · Laguna Beach · Lancaster · Lincoln · Lindsay · Live Oak · Loomis · Los Altos · Los Angeles · Madera · Manhattan Beach · Manteca · Marina del Rey · Marysville · Mather · Merced · Modesto · Moreno Valley · Newport Beach · North Hills · North Hollywood · Oakland · Oakley · Ontario · Pacific Palisades · Palmdale · Palo Alto · Pasadena · Rancho Palos Verdes · Redding · Redlands · Richmond · Roseville · Rowland Heights · Sacramento · San Francisco · San Luis Obispo · San Pablo · Santa Clarita · Santa Monica · Saratoga · Simi Valley · South Gate · Stockton · Sunnyvale · Tehachapi · Torrance · Union City · Vallejo · Van Nuys · Walnut · West Hills · Wheatland · Yorba Linda · Yuba City

Texas (36) Abilene · Arlington · Austin · Bedford · Brownwood · College Station · Conroe · Cypress · Dallas · Forest Hill · Fort Worth · Frisco · Galveston · Georgetown · Haltom City · Houston · Humble · Hunters Creek Village · Katy · Leander · Longview · Mabank · McKinney · Navasota · Pasadena · Plano · Richardson · Rockdale · Rosenberg · Rowlett · Royse City · Santo · Southlake · Spicewood · Waco · Waelder

Florida (32) Aventura · Boynton Beach · Coral Gables · Cottondale · Cutler Bay · Doral · Fort Myers · Fort Myers Beach · Green Cove Springs · Hernando Beach · Highland Beach · Holmes Beach · Jacksonville · Jupiter · Key Largo · Loxahatchee · Marianna · Miami · Miami Beach · Miami Shores · Naples · Ocala · Panama City · Rotonda West · Royal Palm Beach · St. Augustine · St. Petersburg · Sunny Isles Beach · Tampa · Vero Beach · West Palm Beach · Winter Park

Georgia (9) Atlanta · Augusta · Bethlehem · Douglasville · Duluth · Ellijay · Lilburn · Powder Springs · Valdosta

New York (6) Bronx · Brooklyn · East Elmhurst · Far Rockaway · New York · Ronkonkoma

Colorado (5) Aurora · Denver · Fort Collins · Glenwood Springs · Lakewood

New Jersey (5) Forked River · Livingston · Longport · Vineland · Wayne

Pennsylvania (5) Darby · Downingtown · Gettysburg · Philadelphia · Wexford

Maryland (4) Eldersburg · Fort Washington · Middletown · Rockville

Washington (4) Bellevue · Lynnwood · Redmond · Seattle

Arizona (3) Casa Grande · Green Valley · Marana

Massachusetts (3) Arlington · Scituate · Winchester

Michigan (3) Detroit · Lansing · Redford

Ohio (3) Cleveland · Marysville · Olmsted Falls

Connecticut (2) Plainville · West Hartford

Missouri (2) Crestwood · Lee's Summit

North Carolina (2) Dunn · Weaverville

South Carolina (2) Goose Creek · Longs

Virginia (2) Ashburn · Hamilton

Alabama (1) Montgomery

Arkansas (1) Little Rock

Illinois (1) Collinsville

Indiana (1) Carmel

Nevada (1) Las Vegas

New Mexico (1) Hobbs

Tennessee (1) Memphis

U.S. Virgin Islands (1) St. Croix

Utah (1) Park City

Washington DC (1) Washington

Wyoming (1) Alpine

Outside the US (10) Harwell (United Kingdom) · Dresden (Germany) · Ralswiek (Germany) · Mornington (Australia) · Shuwaikh (Kuwait) · Dhaka (Bangladesh) · Chattogram (Bangladesh) · Gazipur (Bangladesh) · Narayanganj (Bangladesh) · Pago Pago (American Samoa)

Client names, addresses and drawings stay confidential; references and redacted samples are available on request. Counts are delivered projects on our record, updated October 2026.

Our guarantee & common questions

SECTION 05

COMPLIANCE STATEMENT

“We prepare your REScheck report to meet your jurisdiction’s adopted IECC energy code. If your permit office requests changes, we re-run it free of charge — up to 3 times — until it is accepted.”
NAME — GET RESCHECK
DATE
What is a REScheck?
REScheck demonstrates that a residential building meets the International Energy Conservation Code (IECC), typically through UA trade-offs across the building envelope. Many jurisdictions require it as part of the building permit package.
When is it required?
Usually for new residential construction, and often for additions and alterations that affect the thermal envelope. Requirements vary by jurisdiction — if your permit office asks for energy-code compliance, a REScheck generally satisfies it.
Which IECC versions and state codes do you handle?
We prepare reports to the IECC version your jurisdiction has adopted, including state-amended codes. Tell us your jurisdiction and we match it.
What do you need from me?
Your plans (PDF), the jobsite address, conditioned square footage, and any insulation or window specs you already have. If specs aren’t finalized, we can work from typical assemblies and adjust.
Does my REScheck need a PE or architect stamp?
In most states, no. The energy code (IECC R103.1) leaves the signatory to state licensing law, and the US DOE sets no rule on who prepares a REScheck. For one- and two-family homes almost every state exempts the drawings from a licensed seal, so the builder, the contractor, the architect or whoever prepares the drawing set signs the report with the permit application, and we sign it as preparer. Where your drawings do need a seal, the architect or engineer who seals them can seal our report too, at no extra cost from us. Known exceptions: New York City (the energy analysis must be signed and sealed by a registered design professional), New York State (seal required unless the home is 1,500 sq ft or less, or the alteration is under the statutory cost threshold), New Jersey (signed and sealed by a design professional, or by the owner-occupant of a detached home), Chicago (compliance form completed by an Illinois-licensed architect or engineer), and California, Washington, Oregon and Massachusetts, which use their own forms rather than REScheck. Confirm with your permit office before ordering; tell us the jurisdiction and we’ll check too.
Can you stamp it for me?
Yes, as an optional add-on on the order form: +$149 for a seal by a partner engineer licensed in your project’s state, added to the amount held at checkout. The sealed copy follows the draft by about 2 business days. We recommend it only when your permit office requires a seal and nobody on your project holds a licence there — it is not something we require. If no partner engineer is available for your state, we tell you before work starts and remove the add-on from your order.
Is the REScheck the same as the energy certificate that gets posted in the electrical panel?
No. The IECC requires a permanent certificate posted on or near the electrical panel (code section R401.3), listing the home’s insulation R-values, window U-factors, HVAC and water-heater efficiencies, and test results. The builder (or the design professional of record) completes, signs and posts it before final inspection, using the values from the REScheck. The last page of our report is that certificate, left blank for the equipment actually installed; on request we can pre-fill it with the values from your report.
When do I pay?
When you order, you enter your card on Stripe’s secure checkout and the price is put on hold — nothing is charged yet. We charge the card when your draft is delivered. Card holds last 7 days, so if a draft ever runs past day 6 we charge it then. If we can’t deliver, the hold is released and you pay nothing. Up to 3 free revisions until your permit office accepts it.
Is REScheck accepted in every state?
REScheck is accepted in most states, wherever the IECC (or a state version of it) is the adopted energy code. California is the main exception: it uses its own Title 24 forms, and we don’t currently prepare residential Title 24. In Florida, the code allows a REScheck printout on the prescriptive path. If your Florida project needs a Form R405 performance report instead, contact us for a quote. Tell us your jurisdiction and we’ll confirm before you order.
What do the mechanical and lighting sections add?
The base $79 report covers the building envelope: insulation, windows, doors and the UA trade-off. For $30 more ($109 total) we add the mechanical section (heating, cooling, water heating and ducts) and the lighting section, which some permit offices require. Not sure which you need? Send us your permit checklist.
Can you prepare a REScheck from a hand sketch or an older set of plans?
Yes, as long as the sketch is dimensioned: we need wall lengths and heights, window and door sizes, and which way the house faces. Photos alone aren’t enough.
Can the same REScheck be reused for the same house plan on another lot or facing a different direction?
Yes. If you build the same plan on another lot or facing a different direction, we re-issue the report for the new address and orientation for $39. If the re-issue also needs a seal, the same +$149 applies.
How are my plans handled?
Your files are used only to prepare your report. We don’t publish or share them.

Basics

Who decides whether REScheck is required — my city, county or state?
The state usually adopts the energy code and its edition (some states leave adoption to local governments). Your city or county building department enforces it and decides which compliance documents it accepts. The quickest way to know is the department’s permit checklist or the plan reviewer’s comment. Send it to us and we’ll match the report to it.

Code & state

What is the difference between REScheck, a HERS/ERI rating and the performance path — which should I use?
Use the compliance path your permit office asks for. Most cities accept REScheck, the prescriptive/total-UA path that compares your envelope with the code’s reference house. It is the fastest and lowest-cost option and suits most custom homes, additions and remodels. The performance path (IECC R405) is a whole-house energy simulation. It allows wider trade-offs, e.g. better HVAC or windows against less insulation, and is useful when a design fails REScheck. The ERI/HERS path (IECC R406) needs a certified HERS rater to model and test the house on site; production builders who already pay a rater often use it. We prepare REScheck reports; performance-path (R405) reports are quoted on request. Not sure which your city wants? Send us the permit checklist or the reviewer’s comment and we’ll match it.

Project type

Do I need a REScheck for an ADU or a garage conversion?
Usually, yes. A new ADU, attached or detached, is new conditioned space, so the energy code applies just as it does to a new house or an addition. A garage conversion needs one whenever unconditioned space becomes conditioned: the converted walls, ceiling, slab and windows must meet the code for an addition, and only the converted area is modeled. Some cities treat unconditioned workshop or storage conversions differently, and California uses Title 24 instead of REScheck. Our price is based on the square footage of the new or converted area only.
Do I need a REScheck if I am only replacing windows or re-roofing?
Usually not a full REScheck. Replacement windows only need to meet the code’s maximum U-factor (and SHGC in warmer climates), which is shown on the NFRC label. Re-roofing generally requires added insulation only where the roof deck or ceiling cavity is exposed. Some cities still ask for a REScheck covering the altered area. If yours does, we can prepare one for just that scope.
Do I need a REScheck, a Manual J, or both?
They do different jobs, and many permits need both. REScheck shows the building envelope (insulation, windows, air sealing) meets the energy code, but it does not size your HVAC. Manual J calculates the home’s heating and cooling loads, and Manual S uses those loads to pick equipment of the right size, which tells you what system to buy. New homes and additions usually need both. An HVAC replacement often needs only Manual J/S, and envelope-only work often needs only REScheck. Order both together and save $50: the same plans cover both reports.

Inputs

How are basement walls, slab edges and crawlspaces handled in REScheck?
Each is entered separately with its own R-value and depth. Conditioned basement walls are entered with their insulation R-value and how far the insulation extends below grade. Slab-on-grade floors get slab-edge insulation (R-value and depth), which is required in colder climate zones. Crawlspaces are entered either as insulated crawlspace walls (unvented crawl) or as an insulated floor above the crawlspace (vented crawl). We take all of these from your wall sections and foundation plan.
How are non-standard walls (ICF, SIP, steel frame, log) entered in REScheck?
REScheck has built-in assembly types for insulated concrete forms (ICF), structural insulated panels (SIP), steel-frame walls and log or other mass walls. Where an assembly doesn’t fit a standard type, we enter the manufacturer’s tested U-factor instead. Send us the product data sheet along with your plans.

Pass / fail

My REScheck says ‘does not comply’ — what are my options?
Check the inputs first: many failures come from the wrong climate zone or code year, default window U-factors used instead of the real NFRC values, or missing continuous insulation. REScheck is a total-UA calculation, so improving one component can make up for another, for example better windows or more attic insulation to offset a weaker wall. If the envelope still can’t pass, a performance (R405) or ERI report can give credit for efficient HVAC and water heating. When your report fails, we tell you the lowest-cost changes that would make it pass and work them out with you and your architect. We re-run the report free up to 3 times until the permit office accepts it.
How does REScheck calculate a pass (the UA trade-off), and can I pass without adding insulation everywhere?
For each part of the envelope (walls, ceiling, windows, floor, doors), REScheck multiplies its U-factor by its area to get how much heat it loses. It adds these up for your house (the UA) and compares the total with the same house built exactly to code minimums. If your total is equal or lower, you pass; the result also shows as a percentage better or worse than code. That means you don’t need extra insulation everywhere: one better component can make up for a weaker one, such as high-performance windows or extra attic insulation offsetting 2x4 walls. Mandatory items can’t be traded away, including air sealing, duct insulation and sealing, and in some climate zones a maximum window U-factor.

Scope

What are the residential lighting requirements under the energy code?
Under the 2021 IECC, every permanently installed light fixture must use high-efficacy lighting, which in practice means LED; some exterior lighting also needs automatic controls. Older code editions require 75% (2015) or 90% (2018) high-efficacy lamps. If your reviewer wants lighting documented, our +$30 option adds the mechanical and lighting sections to your REScheck report.
Does passing REScheck mean I no longer need blower-door or duct-leakage testing?
No. REScheck shows the design meets the energy code on paper; testing proves how the finished house actually performs. Under the 2012 IECC and later, most new homes need a blower-door test to show air leakage is at or below the limit for your climate zone. Additions and alterations are often exempt, but your local office decides. Duct-leakage testing is required when ducts run outside the conditioned space, for example in an attic. A certified rater or tester (HERS rater, BPI or similar) does the testing on site, not us. The inspection checklist in our report lists the targets so your tester knows what to hit.
What is the inspection checklist in the REScheck report, and what does my builder have to do with it?
The pages after the compliance certificate are the inspection checklist. They list every requirement the inspector will verify on site, such as insulation R-values, window labels, air sealing, duct sealing and insulation, and any required testing. Your builder installs to it and keeps a copy on site, and the inspector checks the items off at each inspection.

Process

Who signs the REScheck compliance certificate — you or me?
We sign the compliance certificate as the preparer. If your permit office also wants the builder’s or owner’s signature, there’s a space for it on the certificate.
Will you revise the report if the plan reviewer asks for changes?
Yes. If your plan reviewer asks for changes, we revise the report free of charge, up to 3 times, until your permit office accepts it.

Pricing

DOE’s REScheck software is free — why pay someone to prepare it?
The software is free, but getting it right takes time and know-how. You need the right code year and climate zone, and every assembly entered correctly: wall and ceiling types, window U-factors, slab and basement details, continuous insulation. Wrong entries are the most common reason reports fail or get rejected, and each rejection can delay your permit by days or weeks. For $79, an engineer takes the numbers off your plans, sends a draft within 24 hours, suggests the lowest-cost fix if it fails, and makes up to 3 free revisions until your permit office accepts it. Do it yourself if you have the time; if you’d rather not lose a permit cycle to a data-entry mistake, that’s what we’re for.
Do you offer builder or volume pricing for multiple plans?
Yes. Builders ordering several plans or ongoing volume get a quoted discount. Contact us with your expected volume.
Can I bundle REScheck with a Manual J?
Need a Manual J too? Order REScheck together with Manual J/S/D from our sister site getmanualjsd.com and save $50.

Ready for a permit-ready REScheck?

Send us your plans and get your compliance certificate back within 24 hours — $79 flat, up to 3 free re-runs until your permit office accepts it.

Order your report

Order your report

SECTION 06
  1. 1Project detailsName, email, project address
  2. 2Plans & optionsUpload PDF, optional add-ons
  3. Card paymentCard number on Stripe’s secure checkout · required

Optional — most permit offices don’t ask for it. A REScheck is normally accepted signed by the preparer, and we sign every report. If your office does want a licensed seal, the architect or engineer who seals your drawing set can seal the report we deliver — nothing extra to pay us. Choose this only if nobody on your project holds a licence in that state. Which states require a seal?

Held at checkout: $79 — charged only when your draft is delivered. Add-ons are added here as you pick them.

Last step: you’ll enter your card number on Stripe’s secure checkout — a card is required to place the order. It’s held, not charged; we charge it when your draft is delivered (within 24 hours). Up to 3 free re-runs until your permit office accepts it.

Leave us a message